Development finance explained, from ground up builds to part complete sites

Part complete development

Development finance is the funding that turns a site and a set of plans into finished homes. It pays for the build in stages. It is repaid once the units are sold or refinanced. The right facility can decide whether a scheme starts on time and finishes on budget.

Avamore Capital is a specialist property lender. We provide senior debt to developers and work closely with the brokers who introduce them. We fund ground up builds, part complete sites and finish and exit facilities. This guide explains how development finance works, what first charge lending and senior debt mean for you, and how to fund a scheme that has already started.

What is development finance?

Development finance is a short-term loan used to build or convert property. It is secured against the site. It is repaid when the finished units are sold or moved onto longer term finance. Terms usually run from 12 to 24 months.

It works differently from a mortgage in three ways. The lender looks at the gross development value (GDV), which is what the scheme will be worth once complete. Funds are released in stages as the build progresses, not as one lump sum. Interest is normally rolled up and repaid at the end, so the project carries no monthly payments during the build.

It is also different from a bridging loan. A bridge suits a quick purchase or light works. Development finance is designed for projects where construction is the main event. That includes new builds, conversions and heavy refurbishments.

How does a development loan actually work?

A development loan usually has two parts. The first is a day one advance towards the land or existing building. The second is a build facility, drawn down in stages as work is completed. A typical loan follows these steps.

  1. The lender values the site as it stands and the scheme once finished.
  2. A day-one advance is released against the land or building.
  3. An independent monitoring surveyor reviews the build costs and programme.
  4. Build funds are released in arrears, once the surveyor confirms each stage.
  5. Interest is rolled up and added to the loan balance.
  6. The loan is repaid from unit sales or a refinance at the end of the term.
Development finance process. The lender values the site, releases a day one advance, appoints a monitoring surveyor, releases build funds in stages and rolls up interest.

Two ratios decide how much you can borrow. Loan to gross development value (LTGDV) compares the total loan with the finished value. Loan to cost (LTC) compares it with the total cost of land, build and fees. For example, a scheme with a GDV of £2,000,000 at 70% LTGDV supports a total facility of up to £1,400,000. That figure includes rolled up interest and fees.

Our recent ground up loans have been structured at up to 70% LTGDV. On a nine flat scheme in Sutton, we refinanced the existing lender and funded 100% of the development costs.

What does first charge lending mean for your project?

A first charge is the main legal claim over a property. It is registered at HM Land Registry. It gives the lender first call on the sale proceeds if the loan is not repaid. First charge lending simply means the lender holds that top position.

For a developer, this matters in three ways:

Cost

A first charge lender carries less risk than a second charge or mezzanine lender. Pricing is usually lower as a result.

Control

Only one lender can hold the first charge. Any further borrowing on the site must sit behind it, and normally needs the first charge lender’s consent.

Flexibility

A lender may also take a charge over other property you own. This can support a larger facility or reduce the cash you need to put in.

Most development finance is provided on a first charge basis. At Avamore, our development loans are senior debt secured by a first charge over the site.

Is ground up development finance right for your scheme?

Ground up development finance funds a new build from a cleared or vacant site. It covers the whole journey, from groundworks to practical completion. It suits developers who have full planning permission, a costed build and a clear plan to sell or refinance.

Ground up development carries more construction risk than a conversion. Lenders therefore look closely at the build cost plan, the contractor and the programme. A quantity surveyor’s cost report and a fixed price build contract both strengthen a case.

You do not always need a long track record in new build. We recently funded a two home ground up scheme in Bromley for a developer taking on their first ground up project. The £895,000 loan was structured over 15 months at 70% LTGDV. We also funded most of the professional fees and Community Infrastructure Levy directly. The planning consent was close to expiry, so we checked the borrower had a firm plan to start works in time.

What if your build is already part complete?

Part complete development finance funds a scheme that is already under way. The developer may have self-funded the early stages. The original lender may have withdrawn or been unable to extend. Costs may have overrun and the build may have stalled.

Many lenders decline these cases. Work already carried out has to be checked. The original contractor may have left site. Warranty cover and building control records need to be in order. Each of these adds time and risk.

We created our Part Complete product to fill that gap in the market. When we assess a part complete development, we look at the following.

  • Evidence of the costs spent so far, with invoices
  • Building control inspections for the stages already finished
  • A warranty provider prepared to cover the scheme
  • The monitoring surveyor’s view of the remaining works and costs
  • A realistic budget and programme to reach completion
 

Here are three examples from our part complete book.

  • In Manchester, four of five bungalows were at foundation stage. Our £763,000 loan funded 100% of the remaining works.
  • In south London, the existing lender could not refinance or extend after cost overruns. Our £6.68m facility gave the developer 15 months to finish and sell.
  • In Gloucestershire, four homes had been self-funded to date. Our £1.1m loan at 65% LTGDV was structured over 18 months, with nine months for the build.

How does finish and exit finance work?

Finish and exit finance is one loan that does two jobs. It funds the works needed to complete a part-built scheme. It then gives the developer time after completion to sell the units or refinance onto a term loan. One facility replaces what would otherwise be two separate loans.

Finish and exit often makes sense in these situations.

  • Your current loan term is running out and the build is not finished.
  • Your original lender has pulled out before the works are complete.
  • You expect sales to take longer than the build.
  • You want to move from a costly bridge onto a facility built for development.

One example is a former office building near Reading. The borrower was stuck on a bridge after the original development lender withdrew. They had self-funded the early works. Our £2.1m finish and exit loan on a 12-month term let them complete the scheme.

If your build is already finished, development exit finance may be the better fit. It repays the development loan and gives you time to sell or refinance. We recently provided a £1.8m development exit refinance on four new homes near York.

What will a lender want to see from you?

A complete pack at the start is the fastest route to terms. Whether you are a developer or a broker, these are the documents and details a development lender will ask for.

Planning

Full planning permission, or permitted development approval, with any conditions listed.

Experience

Your track record, or the professional team behind the scheme. That means the contractor, architect and project manager.

Costs

A detailed build cost plan, ideally reviewed by a quantity surveyor.

Programme

A realistic timetable from start on site to practical completion.

Your contribution

The cash or equity you are putting into the scheme.

Exit

Sales evidence from local agents, or indicative terms for a refinance.

Assets and liabilities 

A statement for each borrower and guarantor.

We hold credit meetings every day. That means a well-prepared case can be reviewed quickly, and the terms we issue are credit backed from the outset.

Your development finance questions, answered

What is the difference between development finance and bridging finance?

Bridging finance is a short-term loan, which is usually released in one sum for a purchase or light works. Development finance is released in stages to fund construction. It is monitored by a surveyor throughout the build. It is assessed on the finished value of the scheme, not just its current value.

How much can I borrow with development finance?

Most lenders cap the total loan as a percentage of the gross development value. At Avamore Capital, our maximum is 70% LTGDV. Lenders may also limit it as a share of total costs. The final figure depends on the scheme, your experience and your exit.

What is senior debt in property development?

Senior debt is the main loan on a development. It is secured by a first charge and repaid before any other lender or investor. Because it carries the least risk, it is usually the cheapest layer of funding.

Can I get finance for a part-complete development?

Yes. Specialist lenders such as Avamore fund part-complete developments. You will need evidence of the costs spent so far, building control records for completed stages and a clear budget to finish. A monitoring surveyor will review the remaining works.

Can a first-time developer get development finance?

It is possible. Lenders will look for relevant experience in construction or property and a strong professional team. A modest first scheme with full planning and a clear exit is easier to fund.

What is finish and exit finance?

Finish and exit finance funds the remaining works on a part-built scheme. It then allows time after completion to sell or refinance. It can replace two separate loans with one facility.

How can Avamore help with your next scheme?

We are a solutions led lender. We look at the scheme in front of us, not just a criteria sheet. That is why we take on the ground up builds, part complete sites and finish and exit cases that other lenders often turn away.

If you are a broker with a development case, or a developer planning your next project, speak to one of our relationship managers. You can also reach the team through the live chat on our website. Send us the outline of your scheme and we will tell you quickly whether we can help.